Subject:Problem with very short tasks

User reported the following bug/error:

We have a very nasty crash which I can reproduce with your sample-application. It’s really urgent for us to get a fix for this problem:

1. Open your sample-application “Vehicle Rental/Fleet Control Roster” with “No data source”.

2. Zoom in as far as possible.

3. Create a new Task with the mouse, starting at a full hour and only 15min long (in this zoom-level the grid shows 15min, so the task has to be one cell wide).

4. Until now everything is ok, now zoom out as far as possible.

5. The following exception occurs: “Unhandled exception ….. The width or height of the rectangle {X=366,Y=95, Width=0,Height=39} may not be 0 (null).”

Support Answered:

This has been confirmed to be a bug in all 2.8.5 versions of the ActiveGantt Gantt Chart Scheduler Control (VBN, CSN, VBA, CSA, VBE, VBW, VC) and has been fixed in version 2.8.6

 

HOME | PRODUCTS | ONLINE STORE | AUTHORIZED DISTRIBUTORS | ONLINE DEMOS | TRIAL DOWNLOADS | DOCUMENTATION | SUPPORT | ABOUT US | CONTACT US | SITEMAP | LOGIN

VIEW ALL ARTICLES | VIEW ALL REQUESTS | VIEW ALL REPORTS | VIEW ALL NEWS | JOIN OUR MAILING LIST

TERMS AND CONDITIONS | PRIVACY POLICY | LICENSING | COPYRIGHT